This week Joe and I set up the posts for the solar panels and Brett Carter installed the panels. We also spent a day with the electrician installing lights, with the plumber installing the hot water system, with Caleb completing the roof flashing and another installing surfeits. We completed painting last week.
Thursday, July 17, 2014
Sunday, July 6, 2014
Wednesday, June 18, 2014
Monday, June 9, 2014
Lockup
We have finally reached lockup stage - all doors and windows are in. That means cold winds and the possums are out. The main roof facia and guttering are also complete thanks to Caleb's tin-smithing artistry.
Glen and Cathy Hanson of Eurotrend Doors and Windows install our final door - a large Lift and Slide door from the living area out to the eastern lawn.
The final door in place.
Sunday, June 8, 2014
Wednesday, May 21, 2014
Now the windows are in and the internal framing complete
Joe grinding the concrete slab for tiling.
Mal's ute as mobile scaffold.
Morning sun in the bedroom windows
The bedroom, bathroom etc framing. That's all the internal framing apart from the pantry.
Bathroom
Kitchen and pantry
Sunday, April 27, 2014
Final roof goes on as winter sets in.
Hey! Joe came home and is helping us finish our house. How about that! Easter was wet and windy, so was Anzac weekend. But Caleb, Joe Michael and I eventually got the final roof on.
We also installed 6 more Spotted Gum windows and the first 5 clearstory windows.
Malcolm's ute has no end of important uses. A mobile scaffold is one of them.
I probably won't bring it inside once the floor is tiled.